Record materials received at site (inward) and issued from site (outward). Stock is calculated automatically.
New inward entry
Current stock
Material
Inward
Outward
Balance
Unit
Ledger
Photo
Date
Type
Material
Qty
Party
Challan
Vehicle
Rate
Remarks
Entered by
Status
No entries match. Add an entry from the Inward or Outward tab.
People In / Out Register
Record who enters and leaves the site: staff, labour, contractors and visitors. Time is filled in automatically. A photo is mandatory for first-time check-in.
0Inside now
0Entries today
0Left today
0Heads on site (incl. accompanying)
0Staying onsite (inside)
0On duty (onsite stay)
0Off duty (onsite stay)
Check in
Inside now
Name
Category
Company
Purpose
With
Time in
On site
Duty
Entered by
Nobody is checked in.
Saved people
Everyone who has ever checked in stays here. Tap Check in to log them again with their saved details.
Name
Category
Company
Phone
ID
Visits
Last in
No saved people yet.
Full log
Name
Category
Company
Phone
ID
Purpose
Vehicle
Accompanying
In
Out
Entered by
Checked out by
No entries match.
Safety Penalties
Issue a penalty to anyone on site for a safety violation. Photo evidence is mandatory. Penalties issued by non-admin users need admin authorisation.
0Penalties issued
₹0Fines issued
₹0Fines unpaid
0Awaiting authorisation
New safety penalty
Penalty register
Photo
Date
Person
Violation
Penalty
Issued by
Status
Payment
No penalties match. Issue one from the first tab.
Daily Progress Report (DPR)
Prepare the daily site report: activities, manpower, machinery, notes and sign-off. One DPR per date. A new DPR starts from the previous one.
0DPRs saved
-Latest report date
-Latest DPR no.
New DPR
All DPRs
Date
DPR no.
Weather
Prepared by
Manpower
Last saved
No DPRs yet. Prepare one from the first tab.
Machinery Log
Log daily working hours, idle time, breakdowns and fuel for each machine. The DPR machinery table can be filled from this log.
0Entries today
0Working hrs today
0Breakdown / maintenance today
Machine timer
Press Start when the machine begins work and Stop when it ends. Stop fills the entry below with the date, start/end time and working hours; check it and press Save entry. Running timers are shared, so they show on every phone.
Machine
Started
Running time
By
No machine timers running.
New machinery log entry
Machinery register
Date
Machine
Type
Activity
Status
Start
End
Work hrs
Idle hrs
Fuel (L)
Operator
Remarks
Entered by
No entries match. Add one from the first tab.
Machine-wise summary
Machine
Days logged
Working hrs
Avg hrs / day
Idle / breakdown hrs
Breakdown / maint. days
Fuel (L)
No entries in this period.
Authorized users
Import / Export data
Export
Full backup holds material, people, safety penalties, DPRs, machinery log and photos. User accounts are not included.
Import
Choose a backup (.json) or a CSV downloaded from the Material or People register. CSV files are always added to existing data; rows already present are skipped.
Take photo of material
Vehicle out
Material going out on this vehicle (e.g. empty cylinders in exchange for filled ones). Saved as a linked Outward entry and counted in stock after authorisation.